Preliminary Cost Estimate Report Converts project brief information into a DRAFT Class D (Schematic Design / Order-of-Magnitude) construction cost estimate report with an elemental cost breakdown, location and market-condition adjustments, tiered contingencies, and a clearly documented assumptions and exclusions list. Produces a report for the cost manager or QS to verify before presenting to the owner or design team. Flow Phase 1 — Project Intake Ask one question at a time. Wait for each answer before proceeding. 1. Project identification: project name, client/owner name, location (city and…